General Terms and Conditions of the Foundation for Pathobiochemistry and Molecular Diagnostics for participation in external quality assurance (EQA) and proficiency testing (PT) schemes organised by the Reference Institute for Bioanalytics
valid for all orders placed under the 2027 EQA program
I. Legal framework
- The Reference Institute for Bioanalytics (RfB) is an organisational body operated by the non-profit Foundation for Pathobiochemistry and Molecular Diagnostics (hereinafter ‘SPMD’) and constitutes a special-purpose entity for tax purposes. Through the RfB, the SPMD conducts external quality assurance (EQA) schemes, also referred to internationally as proficiency testing (PT) schemes, for external quality assurance. It is accredited as a proficiency testing provider in accordance with DIN EN ISO/IEC 17043:2023, provided that the respective EQA scheme falls within the valid scope of accreditation, and is listed as a reference institution with the German Medical Association. The accreditation status of the respective EQA scheme is set out in the program, the scope of services and the current annex to the accreditation certificate. A general reference to accreditation does not imply that all EQA schemes offered are accredited.
- The participant’s sole contractual partner is SPMD. Where, for the sake of clarity, these General Terms and Conditions refer to the RfB, the latter acts on behalf of SPMD. These General Terms and Conditions apply exclusively. Individual agreements take precedence.
- SPMD may engage suitable external bodies to carry out specific specialist, technical, logistical or administrative tasks. Where an EQA scheme is carried out within an accredited scope, the responsibilities that are non-transferable under the accreditation requirements – in particular, the ultimate responsibility for design and planning, performance assessment and report approval – remain with SPMD. The participant will be informed of the involvement of a cooperation partner where this is relevant to the service, its validity or the processing of participant data.
II. Eligibility criteria/participant obligations
- Participants may only be entrepreneurs within the meaning of Section 14 of the German Civil Code (BGB), legal entities governed by public law or special funds under public law. Contracts with consumers are not concluded (hereinafter collectively referred to as ‘participants’).
- Participation requires registration via the online platform provided by SPMD or a designated partner and, where required by SPMD, proof of fulfilment of the eligibility criteria. If the order is placed via a partner’s platform, it must be clearly apparent before the order is submitted that the participation contract is being concluded with SPMD. The participant is given the opportunity to access these Terms and Conditions before placing the order and to save them permanently.
- The participant will receive a confirmation of registration and be assigned a unique participant number.
- The participant shall keep their master data, contact details, delivery address, billing details and certificate information up to date at all times. SPMD may charge a reasonable fee for any additional, verifiable costs incurred by the participant as a result of a culpable failure to update this information. The participant is entitled to provide evidence that no costs, or only minor costs, were incurred.
- When conducting the EQA schemes, the relevant legal, normative and technical requirements for the respective EQA scheme shall be taken into account, as well as, where applicable, the German Medical Association’s Guideline on Quality Assurance in Laboratory Medical Tests (Rili-BÄK) in its currently valid version. The specific terms of reference for the respective EQA scheme shall prevail.
- In the context of their participation in SPMD’s programs, participants undertake to ensure that the processing of the EQA schemes is carried out by the participant and not by third parties.
- The participant shall handle the test material in accordance with the safety instructions and all relevant statutory, regulatory and professional requirements. Where test material contains or may contain pathogens, the participant warrants that they hold all necessary authorisations for receipt, import, transport, storage, testing and disposal, or that a statutory exemption or valid regulatory exemption applies. Participants outside Germany must also comply with the applicable national regulations.
- The sample material provided may be used exclusively for EQA purposes and – in the event of problems arising with certain in vitro diagnostic devices (‘IVD’) – for the purpose of quality control as part of the assessment of IVDs. Samples must not be misused; in particular, their use for the production of pathogens or pathogen components for scientific or commercial purposes is prohibited. Furthermore, participants are prohibited from carrying out deconvolution or reverse engineering in an attempt to reconstruct or modify the material.
- Samples must be disposed of in accordance with best practice. Samples and materials from the EQA scheme must not be passed on to third parties. For the purposes of these conditions of participation, ‘third parties’ refers to persons who are outside the legal relationship between SPMD and the contracting party as defined in Section II, paragraph 1.
III. Conclusion of the Contract
- Orders may be placed via a platform operated by SPMD or a designated cooperation partner. The presentation of EQA schemes does not constitute a legally binding offer, but rather an invitation to place an order. By submitting the order, the participant makes a binding offer to conclude the participation contract.
- The parties agree, in accordance with Section 312i(2), second sentence, of the German Civil Code (BGB), that Section 312i(1), first sentence, nos. 1 to 3, and second sentence, of the BGB shall not apply. In particular, SPMD and any platform operator designated by it are not obliged to confirm receipt of an order electronically. Any notification of receipt or acknowledgement, whether automated or sent on a case-by-case basis, does not constitute acceptance of the order. The participant is obliged to check the order details displayed before submitting the order and to correct any obvious input errors before submitting the order via the ordering interface.
- The contract for the respective EQA scheme is concluded upon confirmation of the order by SPMD or upon commencement of the provision of services by SPMD. If the order is placed via a cooperation partner’s platform, that partner acts on behalf of SPMD only to the extent expressly stated during the ordering process.
- The treatment for VAT purposes is governed by the applicable statutory provisions. The provision of a VAT identification number does not automatically result in the transaction being non-taxable or exempt from VAT, nor does it automatically result in the tax liability being transferred to the recipient of the service. Where the statutory requirements are met and have been sufficiently demonstrated to SPMD, the invoice shall be issued in accordance with the applicable statutory requirements. The participant shall provide SPMD in good time with all the complete and accurate information and supporting documents required for the correct assessment of VAT, in particular regarding their status as a business, their VAT identification number, their registered office, any permanent establishment involved and the intended use of the service. They shall notify SPMD of any changes without delay. SPMD is entitled to verify the validity and attribution of a VAT identification number, as well as other tax-relevant information, and to charge German VAT until the verification is complete, insofar as this is necessary according to its due diligence in tax assessment. If a subsequent tax assessment, invoice correction or other additional tax liability is based on incorrect, incomplete or late information or evidence provided by the participant, the participant shall reimburse SPMD for the taxes, interest and reasonable external consultancy costs incurred as a result, insofar as the participant is responsible for the breach of duty. The participant is entitled to prove that no damage, or only minor damage, has been incurred. SPMD’s mandatory liabilities under tax law remain unaffected.
- Any deviating terms and conditions of a participant shall not be recognised.
- If the participant undergoes a conversion or restructuring measure without (partial) universal succession (e.g. a company acquisition agreement in the form of a so-called ‘asset deal’), the participant must ensure that the transfer of the contract concluded in accordance with these General Terms and Conditions to the new legal entity is secured, provided that and to the extent that the participant will no longer be in a position to fulfil their obligations under this contract. Any necessary cooperation on the part of SPMD shall be ensured.
IV. Subject Matter of the Contract / Description of Services / Obligations of the Participant
- The subject matter of the contract is the granting of participation in the EQA scheme conducted by SPMD under the conditions set out in more detail in these General Terms and Conditions. SPMD’s services include, in particular, the obligation to collect and evaluate data submitted by the participant (hereinafter referred to as ‘results evaluation’). The sample material required for the participant to carry out the test, or access to digital images (hereinafter collectively referred to as ‘test material’), shall be provided by SPMD. Furthermore, SPMD shall make the results evaluation relating to the participant’s participation available to the participant.
- SPMD shall notify the participant who submitted the sample of the results evaluation. If the evaluation criteria are successfully met, SPMD shall also issue a certificate to the participant. SPMD may also issue the participant with a certificate confirming their participation in the relevant EQA scheme. Further details are set out in Section VI.
- Participation in EQA schemes is possible under the following contract types:
Contract type A: indefinite participation in one or more EQA schemes within the framework of a continuing contractual relationship (subscription model). The General Terms and Conditions incorporated at the time of conclusion of the contract shall apply to the contract. Subsequent amendments to these General Terms and Conditions shall only take effect for the ongoing continuing contractual relationship in accordance with Section XIV.
Contract Type B: Participation in individual EQA schemes, limited to the calendar year in which the ordered EQA schemes are carried out. The General Terms and Conditions incorporated at the time of conclusion of the respective participation contract apply to that contract. For orders placed in a subsequent calendar year, a new contract must be concluded, based on the General Terms and Conditions in force at that time.
Participants with Contract Type A will be informed of changes to the General Terms and Conditions in accordance with Clause XIV. For Contract Type B, only the General Terms and Conditions effectively incorporated at the time of conclusion of the respective participation contract shall apply. - When registering for the EQA schemes, the participant must choose between Contract Type A and Contract Type B. A switch between contract types is possible at any time up to the registration deadline for the respective EQA scheme.
- Participants may obtain an overview of the planned EQA schemes and the relevant deadlines and dates (e.g. registration deadlines for participation, dates for dispatch or provision of EQA scheme samples/materials, and the final date for submission of results) relating to the EQA schemes (hereinafter referred to as the ‘program’) before the start of each new calendar year. In any case, the latest version of this program is available online at www.rfb.bio/en. This also applies in the event of a participant registering during the course of the year. The deadlines and dates listed there are binding on the participant. Late registration – i.e. after the relevant registration deadline for an EQA scheme – does not entitle the participant to take part in the EQA scheme. Any obligations on the part of the participant arising from their participation in the EQA scheme (e.g. submission of results) which are fulfilled late shall be borne by the participant. The SPMD is entitled to cancel the EQA scheme before it begins or to postpone it within reasonable limits if there are reasons that make it impossible to carry out the test (e.g. if samples are not available). The SPMD will inform the participant of this and endeavour to offer an alternative date for the EQA scheme in a timely manner. However, the participant’s order remains binding until such time as the SPMD issues a definitive cancellation of the EQA scheme.
- This program also sets out the fees payable to the SPMD for participation in the respective EQA scheme, including fees for additional sample material. Where participants are given the option to have multiple analytes analysed, additional costs may apply on top of the base price for the number of analytes defined in the program, in the form of tiered pricing. These, along with an overview of the current delivery costs per country, are listed separately on the website www.rfb.bio/en.
- The test material is provided to the participant solely as a non-independent ancillary service for the purpose of carrying out the relevant EQA scheme and only for the purposes permitted under the contract. This does not constitute a sale of the test material. Dispatch shall take place on the dates specified in the program, the service description or the order confirmation, via a transport company selected by SPMD or a cooperation partner designated by it. SPMD is entitled to conclude the contract of carriage in its own name but on behalf of the participant. The risk of accidental loss or damage to the test material – which has been securely packaged for transport, classified and properly labelled – passes to the participant upon handover to the transport company. SPMD’s liability for any incorrect classification, packaging, labelling or documentation for which it is responsible, for culpable errors in the selection or commissioning of the transport company, and for any other breaches of duty for which it is responsible, remains unaffected. SPMD complies with the mandatory German and EU customs, export, export control, sanctions, dangerous goods and security requirements applicable to it. The participant shall comply with the import, registration, acceptance, transport, storage, handling, use and disposal requirements applicable in the country of receipt, transit and destination to them or to the consignee designated by them. The participant shall provide SPMD, in good time prior to the scheduled dispatch, with all accurate and complete information, declarations, authorisations, end-use documents and other supporting evidence required for export, transit and import. This includes, in particular, details of the consignee, end-user, destination, intended use and any intended onward shipment. SPMD may require the submission of suitable originals or official confirmations. SPMD is entitled to refuse to accept an order, to suspend dispatch or to withdraw from the relevant EQA scheme if statutory or regulatory prohibitions, sanctions, embargoes, export control or dangerous goods regulations prevent this, if a required authorisation is not available in good time, if there are reasonable doubts regarding the recipient, end-user, end-use or destination, or if carrying out the procedure would result in a disproportionate legal or security-related risk for the SPMD. Insofar as the participant is not responsible for the impediment, any fees already paid for services not rendered shall be refunded; further claims shall be governed by Clause IX. The participant may not, without the prior written consent of SPMD and without all necessary regulatory authorisations being in place, pass on the test material to third parties, nor may they transport it to another country, re-export it, divert it or use it for any purpose other than that specified. This also applies to components, derivatives, materials derived therefrom and technically essential information, insofar as these are subject to export control restrictions. The participant shall bear the agreed transport costs as well as any customs duties, import VAT, import levies, customs clearance fees, brokerage fees, inspection fees and official charges incurred in the country of receipt, transit or destination. To the extent permitted by law, the Participant or the recipient designated by them shall act as the importer or importer of record. Any assumption of this role by SPMD requires an express agreement. Additional costs arising from storage, demurrage, return, redelivery, official seizure or destruction shall be borne by the participant, insofar as they result from incorrect or incomplete information for which the participant is responsible, missing authorisations, refusal to accept delivery or other breaches of duty. The participant is entitled to prove that no costs were incurred or that the costs were lower. Statutory or regulatory decisions regarding customs classification, customs value, origin, export control classification, dangerous goods classification and licensing requirements remain unaffected. The information used by SPMD in shipping or customs documents does not constitute a guarantee of recognition by foreign authorities. Digital test materials and access to data transmission are provided online.
- SPMD shall issue invoices no later than upon completion of the respective EQA scheme. Invoices shall be sent in the form prescribed by law. To the extent permitted by law, SPMD shall determine the reasonable method of transmission; in particular, it may use an email address provided by the participant for this purpose. Transmission via a participant’s invoicing portal shall only take place if this was expressly agreed prior to the conclusion of the contract, if access is possible for SPMD with reasonable effort, and if the participant provides the necessary access details, references and technical information in full and in good time. Where an electronic invoice in a structured format is required by law or has been agreed, the participant shall provide the accurate details and technical requirements necessary for its receipt and processing. The participant shall keep their billing and contact details up to date and shall inform SPMD immediately of any changes or technical reception faults. The invoice amount is due for payment without deduction within 14 calendar days of receipt of the invoice, unless a different payment term is specified in the invoice, the service description or the order confirmation. Any subsequent correction to the invoice shall not affect the due date of the undisputed net amount. Where the correction results in an additional amount payable, this shall be due within 14 calendar days of receipt of the corrected invoice. Any amount arising in favour of the participant shall be refunded in accordance with statutory provisions or set off against SPMD’s due claims. Payment shall be made via a payment method offered by SPMD and specified in the invoice. Statutory objections to the basis and amount of the claim, as well as rights arising from non-performance or defective performance, remain unaffected.
- Electronic communications shall be deemed to have been received in accordance with the general statutory provisions. The participant shall ensure that the email address provided by them remains operational and shall inform SPMD immediately of any changes.
- If, due to contact details that the participant has culpably failed to update, or which are incorrect or non-functional contact details, it becomes necessary to resend an invoice or reminder by post, or if the participant expressly requests such postal delivery, SPMD may claim lump-sum compensation of EUR 5.00 for each required resending to cover the additional postage, material and directly attributable dispatch costs typically incurred as a result. The flat-rate charge shall not be levied if the participant is not responsible for the need for the re-sending. The participant is expressly entitled to prove that SPMD has incurred no loss or a significantly lower loss. SPMD reserves the right to prove that a higher, actually incurred and reasonable loss has been suffered. Double charging for the same expenses, in particular in addition to Clause II.4, is excluded. Statutory claims arising from late payment, in particular interest on arrears and the flat-rate late payment charge under Section 288(5) of the German Civil Code (BGB), remain unaffected; statutory set-offs must be observed.
V. Conduct of the EQA schemes
- For both Contract Type A and Contract Type B, the participant shall receive all the EQA schemes selected by them during registration for the respective announced EQA scheme period, for the entire duration of the contract term.
- The participant shall carry out the analysis of the material provided and submit the results, together with the information required for evaluation, online. By submitting the results, the participant confirms that, in the EQA schemes, only those results are submitted which have actually been obtained through the participant’s own analysis of the sample material sent and carried out under their responsibility.
- The conditions, scope and duration of any withholding of services not yet commenced, any provisional suspension of authorisation or any blocking of the participant’s access shall be governed exclusively by Clause XI. The participant’s obligation to pay and the technical investigation of substantiated indications of manipulation or a material breach of the participation requirements remain unaffected by this.
- The obligation to pay arises at the time the contract is concluded in accordance with Clause III of these General Terms and Conditions. It ceases exclusively in the event of payment by the participant, cancellation of the EQA scheme by SPMD in accordance with Clause IV No. 5 of these General Terms and Conditions, or timely withdrawal by the participant within the deadline specified in the confirmation of registration.
VI. Evaluation of the EQA schemes
- The SPMD shall evaluate the test results determined by the participant as part of the EQA scheme, provided that these are submitted to the SPMD in accordance with the timetable. The participant has no entitlement to evaluation of test results received by the SPMD after the deadline.
- The participant must submit the test results exclusively via the communication channels provided or specified by the SPMD (e.g. online via the RfB online platform). The SPMD evaluates the results on the basis of assessment criteria determined by the SPMD. Where available, the criteria set out in the relevant tables of the German Medical Association’s Guidelines on Quality Assurance in Laboratory Medical Tests (Rili-BÄK), in their currently valid version, shall be applied.
- Participants will receive a report on the results for all measured parameters or tests submitted by the deadline and, where provided for in the relevant EQA scheme, a certificate of participation. If the assessment criteria are met, the SPMD will issue a certificate listing the measured parameters for which the measurement or test results comply with the target specifications. The date of issue corresponds to the closing date for submissions of the relevant EQA scheme. Where the Rili-BÄK applies, the period of validity is governed by its applicable provisions. If a subsequent technical review reveals – in particular due to an identified error in the data basis, calculation or evaluation; a subsequent change to the evaluation criteria relevant to the assessment; or a significant change in the group of participants relevant to the assessment – that an evaluation of results, a certificate of participation or a certificate is factually incorrect or requires revision, the SPMD may correct the document in question, replace it with a corrected version or, where an appropriate correction is not possible, revoke it. The SPMD shall inform the participant in text form within the meaning of Section 126b of the German Civil Code (BGB) of the reason, scope and legal consequences of the revision and shall mark the replaced or revoked version as invalid. The participant must cease to use a version marked as invalid upon receipt of the notification and, insofar as it has been presented to third parties, must replace it with the valid version to the extent reasonably practicable. Statutory, technical, regulatory and accreditation-related requirements remain unaffected.
- The participant may freely dispose of their analyses and reports within the scope of intended use.
VII. Withdrawal, Termination
- The participant is free to withdraw from participation in an EQA scheme up to the registration deadline specified in the timetable for each test. Withdrawal is not possible after the registration deadline.
- If a participant has registered to take part in several EQA schemes, they may withdraw from all or only some of the EQA schemes. However, this is only possible up to the time specified in Section VII, paragraph 1, sentence 2.
- Participants with Contract Type A may terminate their subscription at any time. From the date of termination, only those EQA schemes for which the registration deadline has already passed by that date will be dispatched. It is also possible to suspend the subscription for an agreed period for one or all registered EQA schemes up to the respective registration deadline.
- Regardless of the contract type, withdrawal and/or termination must be carried out online via the participant’s account or by email, quoting the participant registration number. There are no specific formal requirements.
- The SPMD is also entitled to terminate the contractual relationship in accordance with statutory provisions, which includes termination for good cause.
VIII. Objections/Complaints
- Upon receipt of the results analysis, the participant has the option to submit any complaints or objections within 30 days to info@spmd-rfb.de or via a contact form provided specifically by SPMD. To do so, the participant must clearly state whether they wish to submit a complaint or an objection.
- All complaints and objections received are handled and investigated as part of SPMD’s complaints management process. In the event of a complaint or objection, SPMD staff will contact the participant. The facts of the matter are then investigated internally, and the participant is informed of the findings and any necessary measures taken. The final assessment of a complaint or objection must be confirmed by at least one person at SPMD who is not responsible for the relevant EQA scheme within the internal organisation that gave rise to the complaint or objection. The outcome of the complaint is also confirmed by the Head/Deputy Head of the RfB or the responsible QMB. It is ensured that the complaint or objection does not result in any disadvantage to the complainant. The participant is informed when the processing of the complaint or objection has been completed.
- In the event of a valid complaint or a valid objection, the SPMD shall inform the participant in text form of the outcome of the review and of any necessary amendments or reissues, in particular a corrected version of the results analysis, the report, the certificate of attendance or the certificate. Where several technically appropriate remedial measures are available, the SPMD shall determine the nature of the remedy, taking into account the legal, technical, regulatory and accreditation-related requirements. Clause VIII.4 remains unaffected.
- In the event of a significant breach of contract for which SPMD is responsible, the participant’s statutory rights remain unaffected. Where subsequent performance is possible and reasonable for the participant, SPMD shall determine the appropriate form of subsequent performance, taking into account the nature of the breach as well as the statutory, technical, regulatory and accreditation-related requirements. This may, in particular, take the form of correcting the results analysis, re-analysing the results, providing replacement materials or conducting a replacement EQA scheme. If rectification is impossible, unreasonable for the participant or has failed, the participant’s further rights shall be governed by the statutory provisions. Claims for damages and reimbursement of expenses shall be determined in accordance with Section IX.
IX. Liability
- The following liability provisions apply to all contractual and non-contractual claims for damages and reimbursement of expenses brought by the participant against SPMD, irrespective of their legal basis. SPMD shall be liable without limitation in cases of wilful misconduct and gross negligence, in the event of culpable injury to life, limb or health, under the Product Liability Act, and to the extent of any guarantee expressly assumed by it or any procurement risk expressly assumed by it. Other mandatory statutory grounds for liability remain unaffected.
- In the event of a breach of a material contractual obligation due to slight negligence, SPMD’s liability is limited to compensation for damage that was foreseeable at the time the contract was concluded and is typical of the contract. Material contractual obligations are obligations whose fulfilment is essential for the proper performance of the contract and on whose fulfilment the participant may reasonably rely.
- In all other respects, SPMD’s liability for slight negligence is excluded. The above exclusions and limitations of liability shall apply mutatis mutandis in favour of SPMD’s organs, legal representatives, employees, other staff, agents and vicarious agents.
X. Confidentiality/Data Protection
- SPMD is obliged to label data relevant to the contract and to store it in a traceable manner. To this end, the data and information are, among other things, recorded in a database system and stored for 10 years.
- SPMD retains contract, participant, results, evaluation, report and verification data in accordance with the applicable legal, tax, accreditation and quality assurance requirements. Retention periods depend on the data category and the purpose of processing. Details are set out in the current data protection information and SPMD’s data retention and deletion policy.
- SPMD may use and publish EQA scheme results for statistical, scientific and quality assurance purposes in a form that does not allow identification of a specific participant or natural person. Where data is merely pseudonymised, its processing takes place exclusively on a legal basis established for this purpose and in accordance with the data protection information.
- Withdrawal of consent is only required and possible where processing is based on consent. Statutory rights to object remain unaffected.
- SPMD and participants shall comply with the General Data Protection Regulation and other applicable data protection regulations. Information on responsibilities, categories of data, purposes, legal bases, recipients, international transfers, retention periods and data subjects’ rights is contained in the current SPMD data protection notice.
- Data to be treated as confidential includes, in particular, trade secrets and information within the meaning of Article 2(1) of Directive (EU) 2016/943 ‘on the protection of undisclosed know-how and business information (trade secrets) against their unlawful acquisition, use and disclosure’ or Section 2(1) of the Trade Secrets Protection Act (GeschGehG).
- The obligation of confidentiality does not apply to:
- information that can be proven to originate from generally accessible sources,
- information that is already public knowledge or generally known, or that corresponds to the current state of the art
- information which the relevant party is obliged to disclose on the basis of legal provisions or official orders (e.g. requests for information from courts and authorities),
- inspections of contract documents by assessors from the accreditation body,
- SPMD documents prepared for the client that are subject to publication (e.g. certificates),
- reporting to an arbitration body in the event of a complaint.
- The obligation of confidentiality ends 3 years after the completion of the contract / the end of the contractual cooperation with the client, unless otherwise agreed with the client.
- SPMD is entitled to further utilise the assessment results of EQA schemes submitted by participants in aggregated and anonymised form. The participant is aware that this data will also be published on the SPMD website for the purpose of further developing quality assurance.
XI. Suspension of Services, Account Blocking
- SPMD is entitled to temporarily suspend the participant’s access and the provision of services not yet commenced following an unsuccessful reminder, if the participant is in arrears with a due and undisputed claim or one that has been legally established, and the suspension is proportionate, taking into account the amount and duration of the payment arrears as well as the impact on the participant. The same applies in the event of a material breach of contract, provided that SPMD has previously requested the participant to remedy the situation within a reasonable timeframe. A prior request for remedy is not required if it is not legally necessary or if immediate suspension is required to protect the integrity, security or proper conduct of the EQA scheme. SPMD may immediately suspend any access authorisation obtained using false or falsified data. The suspension must be limited to the extent and duration necessary and must be lifted as soon as the grounds for it no longer apply. Finalised results evaluations, reports, certificates of participation or certificates may only be withheld or their accessibility restricted to the extent that this is legally permissible and compatible with technical, regulatory and accreditation-related requirements. Access to complaints and appeal procedures, safety-related information and documents whose provision is mandatory remains unaffected.
XII. Contractual penalty
- The participant is aware that compliance with the obligations set out in full in Section XII.2 is of vital importance for the integrity, security and proper conduct of the EQA schemes, as well as in relation to regulatory requirements.
- If the participant culpably breaches a material obligation relating to the independent processing of the EQA scheme, the unaltered and timely submission of their own test results, the safe handling of the test material, or the prohibition on the unauthorised disclosure or misuse of the test material, the SPMD may demand an appropriate contractual penalty. Measures to withhold services and to suspend the participant’s access shall be governed exclusively by Clause XI.
- In the event of a continuing breach, the contractual penalty shall be forfeited only once; the duration of the breach shall be taken into account when determining its amount.
- The amount of the contractual penalty shall be determined by the SPMD on a case-by-case basis at its reasonable discretion, taking into account the nature, severity, duration and consequences of the breach; it is subject to judicial review.
- The contractual penalty becomes payable upon notification of its amount to the participant.
- Any forfeited contractual penalty shall be set off against any damages payable in respect of the same breach. Any further claims for injunctive relief, rectification and damages remain unaffected.
XIII. Copyright
- Insofar as SPMD’s services are protected by copyright, the copyright remains with SPMD or the respective rights holder. The participant is granted the non-exclusive right to reproduce, without alteration, their individual evaluations, reports, certificates of participation and certificates for their own quality management, accreditation, verification, supervisory and contractual purposes, and to make these available to the relevant authorities. Any misleading, distorting or promotional use, as well as any changes to the content, requires the prior consent of SPMD.
- Disclosure to public authorities, accreditation bodies, clients, affiliated companies and other bodies entitled to receive such documentation is permitted within the scope of the aforementioned purpose of use.
XIV. Amendments to the General Terms and Conditions and Price Adjustments
- SPMD may amend these General Terms and Conditions for ongoing contracts of Type A insofar as this is necessary to take account of a change occurring after the conclusion of the contract in mandatory legal provisions, supreme court case law, enforceable regulatory requirements, accreditation-related requirements or binding technical regulations, or to close a loophole in the contract that has arisen after the contract was concluded and which makes performance of the contract significantly more difficult. The amendment must be limited to the extent necessary for the adjustment and must be reasonable for the participant, taking into account the interests of both parties. In particular, it must not alter the nature and scope of the essential contractual services, the contractual balance of consideration, the term of the contract, rights of termination or liability to the detriment of the participant. Price adjustments shall be governed exclusively by Clause XIV.4.
- SPMD shall notify the participant in text form of any amendments pursuant to Clause XIV.1 at least six weeks before the intended date on which they are to take effect. The notification shall specify and explain the reason for, the content of, the date on which the amendment is to take effect, and the material consequences of the amendment. The amendment shall take effect on the date notified, provided that the conditions set out in Clause XIV.1 are met. The participant may object to the amendments up to the intended date on which they are to take effect. If the participant objects, the previous terms and conditions shall continue to apply insofar as this is legally and operationally reasonable for SPMD; otherwise, either party may terminate the continuing contractual relationship with effect from the date of the amendment. The notice of amendment shall specifically draw attention to the right to object and the legal consequences. EQA schemes already commenced and any rights and obligations arising up to the date the amendment takes effect shall remain unaffected.
- For Contract Type B, the General Terms and Conditions effectively incorporated at the time of conclusion apply to each participation contract. For future participation contracts not yet concluded, SPMD may use an amended version of its General Terms and Conditions if this is made available to the participant in a reasonable manner prior to the submission of their order and is effectively incorporated into the respective contract. If the participant has already placed an order which has not yet been accepted by SPMD, the amended Terms and Conditions shall only form part of the contract if the participant expressly agrees to their inclusion or places a new order on that basis. Participation contracts of Contract Type B that have already been concluded remain unaffected, unless an express amendment agreement is reached or mandatory statutory or regulatory requirements preclude this.
- In the case of continuing contractual relationships, SPMD may, at its reasonable discretion, adjust prices in line with verifiable changes in the relevant costs that have occurred since the conclusion of the contract. Cost increases and cost reductions shall be taken into account according to the same criteria, and opposing trends shall be offset against one another. Any change shall be notified in text form at least six weeks in advance. The participant may cancel any affected EQA schemes that have not yet commenced, free of charge, before the change takes effect. Section 315 of the German Civil Code (BGB) remains unaffected.
- If, after the conclusion of the contract, the value-added tax regulations or rates applicable to the agreed service change, the invoice shall be issued or amended in accordance with the value-added tax treatment required by law at the time the service is performed. An agreed net price remains unaffected by this; the VAT due shall be added at the rate prescribed by law or, where no VAT is due, shall not be charged. This does not give rise to any right of termination or withdrawal, unless the net price or another contractual service is amended at the same time.
XV. Governing Law, Jurisdiction and Severability Clause
- The contract concluded between the participant and SPMD is governed by the law of the Federal Republic of Germany, subject to mandatory provisions of private international law, as agreed by the parties involved.
- If the participant is a trader, a legal person under public law or a special fund under public law, the exclusive place of jurisdiction shall be Bonn, insofar as permitted by law. The place of performance is Bonn, Germany.
- Should any individual provisions of these General Terms and Conditions be or become invalid in whole or in part, the validity of the remaining provisions shall remain unaffected. The invalid provision shall be replaced by the relevant statutory provisions. No reduction shall be made to preserve the validity of the remaining provisions.
